Sensa Optimizer

The best plan. All the time.

For land, sea or both. Optimizer finds the most profitable production plan within your limits. When something changes, it finds a new one in minutes.

Production plan:

days minutes

  • Planner time
  • Capacity utilisation
  • Predictability

The problem

Production never goes to plan.

Sea lice, disease, a delayed smolt delivery, and the spreadsheet has to be redone. It takes days. And nobody knows whether the new plan is good, only that it adds up.

  • How do you make the plan today, and how long does it take?
  • How often do you have to replan, and do you have time to?
  • Is production optimised today, and how much more could you get out of it?

The solution

  • Optimise, don’t just plan.

    AI working together with Sensa’s industrial optimisation algorithms finds the most profitable plan within the limits you set: site layout, capacities, maximum allowed biomass (MAB), smolt, fallowing, contracts. More possible plans than atoms in the universe, and the best one in minutes.

  • Replan when something happens.

    Update the assumptions and get a new optimal plan from where you are now. In minutes, as often as you like.

  • Plan under uncertainty.

    Growth, temperature and capacity are not known in advance. Optimizer lets you explore what happens to the plan when things do not go as expected.

  • Land, sea, or both.

    Smolt, post-smolt and grow-out in one model. One site, a region or the whole company.

  • Contracts and investments.

    See what a contract does to the rest of production before you sign. See what an extra module does to the result before you invest.

  • One official plan. As many scenarios as you like.

    Nothing becomes the official plan until you promote it. The official plan can always be changed, manually or with a sentence to Unity AI.

Optimizer does not replace the planner. It gives the planner superpowers.

How it works

  1. Connect.

    Standing biomass is fetched from Sensa Unity. The plan always starts from where you actually are.

  2. Describe the limits.

    Physical limits, regulations, contracts and operational limits. Standard TGC or your own growth models per site. Often done in one session.

  3. Optimise.

    The engine proposes the best plan. Compare it with today’s plan and other scenarios side by side. Wondering why the plan turned out that way? Ask Unity AI.

  4. Promote.

    If you prefer a scenario, you promote it. It replaces the old one.

And then back to step 1.

See it in use

You see the result straight away: tonnes, NOK and MAB utilisation side by side with today’s plan. Demo data.

  1. The plan shows 20,008 tonnes. Could the result be better?

    See how different plans can be compared. The example uses demo data.

  2. Same facility. Higher value.

    Same limits. Just better timing. Demo data.

  3. Does the plan promise more than it can keep?

    Calculated on the growth the fish actually have, not on an assumption. Demo data.

All videos

Frequently asked questions

Do we have to stop using the spreadsheet?
Not on day one. Most start by loading today’s plan into Optimizer and comparing. The spreadsheet becomes the benchmark you measure against, until you no longer need it.
Do we need Sensa Unity?
Yes. Optimizer is built on the Unity foundation. Unity is what gives Optimizer the right context: quality-assured data, linked to what it describes at the site. The complete solution is still cost-effective compared with similar solutions.
What does it actually optimise for?
Economics, always. Everything else you want to achieve, such as an even harvest profile or maximum weight, goes in as limits. MAB utilisation usually ends up higher than before, but maximum MAB is not always the most profitable.
We already plan based on biology and growth models.
Biology is in Optimizer too. The difference is that it calculates the limits at the same time, and recalculates when production changes. That matters especially at smolt facilities.
Can a plan from Optimizer become official without us knowing?
No. You always have one official plan, and a scenario only becomes official when you promote it.
How long does it take to get started?
If you already have an overview of your constraints, much of it is done in three hours.
What does it cost?
Cost-effective compared with similar solutions. Price depends on scope. Book a demo.

Start small.
Prove value.
Scale.

  1. Weeks 1–2Connect the data
  2. Weeks 3–6Put the data to work
  3. Weeks 7–12Measure the impact
  4. ThenScale

Limited investment in the first 90 days.