Renewable energy glossary

The terms power producers and grid companies use about generation, grid and market, maintenance, preparedness and data, explained briefly and with a source.

A

aFRR (automatic frequency restoration reserve, secondary reserve)

An automatic reserve that brings the frequency back to 50.00 Hz and frees up FCR for new deviations. It is activated from Statnett’s control system and must be fully activated within 5 minutes.

Source Statnett, Secondary reserves (in Norwegian)

AMS (advanced metering system, smart meter)

A two-way information and communication system from the electricity meter to the grid company’s central system. The meter must record active and reactive flow in both directions and store values at least every 60 minutes, with the option of every 15 minutes. It can also disconnect or limit the power drawn.

Source Lovdata, Settlement Regulations, sections 1-3 and 4-2 (in Norwegian)

C

CENS (cost of energy not supplied, KILE)

A scheme that gives grid companies an incentive to keep the right level of continuity of supply. CENS is calculated for each interruption based on how long it lasted, when it happened, whether it was notified and which customers were affected. The amount is deducted from the grid company’s revenue cap.

Source Norwegian Energy Regulatory Authority (RME), Cost of energy not supplied (in Norwegian)

Circuit breaker

A switch designed to make, carry and break both normal load currents and specified short-circuit currents. Together with fuses, it is the protection that interrupts the current in a short circuit.

Source Store norske leksikon, circuit breaker (in Norwegian)

Condition-based maintenance

Maintenance triggered by the measured or assessed condition of a component, not by fixed rules or intervals. It requires data on the condition, for example from sensors, and criteria for when maintenance should be done.

Sensa With Sensa you use sensor data and maintenance history to assess the condition of the equipment.

Source SINTEF/CINELDI, Condition-based maintenance of substations (in Norwegian)

Conditional connection (connection with conditions)

Connection to the grid on special conditions because the grid has limitations, for example bottlenecks, voltage or short-circuit capacity. Statnett, as system operator, must know about these agreements to manage bottlenecks and operational disturbances.

Source Statnett, Connections with conditions (in Norwegian)

D

Digital twin

A digital model of a physical system and its processes. It is updated automatically with data from the physical system, so that it resembles it as closely as possible at all times. It provides a basis for decisions such as maintenance needs and changes in operations.

Sensa Unity AI represents your facility in a digital model that shows how equipment and processes are connected.

Source Store norske leksikon, digital twin (in Norwegian)

Distribution grid

The local grid that supplies electricity to most end users, with voltages up to 22 kV. Below 1 kV is low voltage, which at the customer is usually 230 or 400 V.

Source Energy Facts Norway, The electricity grid

E

Earth fault (ground fault)

An unwanted conductive connection between a live part and earth. It can be anything from a phase conductor that has fallen to the ground to leakage current from moisture. Earth fault protection and residual current devices limit the damage.

Source Store norske leksikon, earth fault (in Norwegian)

Elhub

Norway’s IT platform for collecting and distributing electricity data, with over 4 million metering points. Elhub is a public company owned by Statnett and is financed by grid companies and electricity suppliers.

Source Elhub, about us (in Norwegian)

Emergency plan (contingency plan)

The plans a KBO unit must have for extraordinary situations, adapted to the nature and scope of its business. They must be based on risk assessments and cover measures for major accidents, significant damage, threats and rationing. The plans must be kept up to date.

Sensa With Sensa you see which sites and functions are affected by faults or extreme weather, and connect this information with your emergency plans.

Source Lovdata, Power Supply Preparedness Regulations, section 2-4 (in Norwegian)

Extreme weather

In weather forecasting, weather that poses a danger to life and property. The term is also used for an individual storm. Extreme weather is a common cause of interruptions in the electricity grid.

Source Store norske leksikon, extreme weather (in Norwegian)

F

FCR (frequency containment reserve, primary reserve)

A reserve that is activated automatically based on the grid frequency. FCR-N operates within 49.9 to 50.1 Hz. FCR-D is activated at larger deviations, down towards 49.5 Hz or up towards 50.5 Hz.

Source Statnett, Primary reserves (in Norwegian)

Flexible generation (regulated production)

Power production that can be adjusted to market conditions, especially hydropower with a reservoir. The power plants can adapt production within the limits of their licence and the conditions in the watercourse. Wind power, solar power and most run-of-river power cannot be regulated.

Source Energy Facts Norway, Electricity production

Forecast

A calculation of how something will develop, often based on available facts. In the power industry, forecasts are made for inflow, consumption and price, among other things.

Source Store norske leksikon, forecast (in Norwegian)

Frequency (grid frequency)

A measure of the instantaneous balance between production and consumption, and the same throughout the Nordic synchronous area. The frequency should be 50 Hz, with normal variation between 49.9 and 50.1 Hz. If it is too low, more is consumed than produced, and if it is too high, more is produced.

Source Energy Facts Norway, Security of electricity supply

G

Grid company (DSO)

A company that owns and operates a distribution grid or regional grid. Operating the grid in an area is a natural monopoly, so customers cannot switch grid company. That is why grid companies are under public control by NVE.

Source Store norske leksikon, grid company (in Norwegian)

Grid losses (network losses)

Electrical energy lost when electricity is transported through the grid, in lines and transformers. The grid company measures what goes into and out of the grid and buys power to cover the difference. The losses are smaller the higher the voltage is.

Sensa With Sensa you see operating data in the context of how equipment and systems work, and find opportunities to reduce losses.

Source Store norske leksikon, grid losses (in Norwegian)

H

Head (hydropower)

The vertical distance between the water level at the intake and at the outlet of a hydropower plant. Gross head is measured from the highest regulated water level in the intake reservoir to the normal water level at the outlet, and the effective head may differ slightly because of head losses. Together with the flow, the head determines how much energy the water can provide, and it determines which turbine type is suitable.

Source Store norske leksikon, head (in Norwegian)

Hydropower plant

A plant that converts the energy in falling water into electrical energy. The power station itself consists of a turbine, generator and transformer. Together with regulating structures such as dams, gates and transfer tunnels, it makes up a complete plant.

Source Store norske leksikon, hydropower plant (in Norwegian)

I

Icing

Ice that forms on an object when water droplets or wet snow freeze onto it. Many power cuts happen because power lines are overloaded with ice and collapse or are damaged.

Source Store norske leksikon, icing (in Norwegian)

IEC 61850

An international series of standards for communication networks and systems for automation in power utilities. It is used especially in substations, so that protection and control from different suppliers can exchange data.

Source IEC, IEC 61850 series

Inflow

The water that flows into a catchment area over a year, usually given in million cubic metres. Inflow is high during the snowmelt in spring and when it rains in autumn, and low in winter.

Source Store norske leksikon, inflow (in Norwegian)

Installed capacity

The maximum output a turbine or generator is designed for, given in MW. It is also called rated output or nameplate capacity. Installed capacity says what the plant can deliver, not how much it produces over a year.

Source Store norske leksikon, installed capacity (in Norwegian)

Inverter

A device that produces alternating voltage from direct voltage using controlled semiconductors. Solar panels and batteries supply direct current, so an inverter is needed before the electricity can be fed into the grid.

Source Store norske leksikon, inverter (in Norwegian)

K

L

M

Machine learning

A branch of artificial intelligence where computer programs use statistical methods to find patterns and relationships in large amounts of data. The program learns to solve the task itself instead of being programmed for it.

Source Store norske leksikon, machine learning (in Norwegian)

Metering interval

How often a meter stores a metered value. All feed-in except from plus customers, all consumption in high-voltage installations and all exchange between metering grid areas must have 15 minutes. Other metering points with AMS have 60 minutes.

Source Lovdata, Settlement Regulations, section 3-2 (in Norwegian)

mFRR (manual frequency restoration reserve, tertiary reserve)

A reserve that is activated manually to keep the balance in each price area and free up aFRR. It is also used against overloads in the grid. A bid must be at least 1 MW and be activated within 12.5 minutes.

Source Statnett, Tertiary reserves (in Norwegian)

Minimum flow

The lowest permitted flow in a regulated watercourse, given in m³/s. The level is set in the licence conditions, usually based on an impact assessment. The requirement is laid down in section 10 of the Water Resources Act.

Source Store norske leksikon, minimum flow (in Norwegian)

N

N-1 criterion

A planning principle that a fault on one component should normally not cause an interruption for end users. It is used especially for investments in the transmission grid, but does not replace the socio-economic assessment of each new line.

Source Energy Facts Norway, Security of electricity supply

Network tariff (grid tariff)

The price for having electricity transported through the grid. It consists of an energy component, which varies with consumption and among other things covers grid losses, and a fixed component, which covers a reasonable share of the fixed costs of building, operating and maintaining the grid.

Source Norwegian Energy Regulatory Authority (RME), Network tariffs

Nord Pool

A power exchange with day-ahead and intraday markets in the Nordic and Baltic countries, Great Britain and several countries on the Continent, among them Germany, France, the Netherlands and Poland. In the spot (day-ahead) market, power is traded for physical delivery the next day, at a price that balances supply and demand.

Source Nord Pool: Our business

Normal annual production

The power produced in a year with normal weather conditions. It is used to compare production from year to year, because inflow, wind and sun vary.

Source Energy Facts Norway, Electricity production

O

Offshore wind

Power production from wind turbines at sea, either bottom-fixed or floating. Bottom-fixed turbines stand on the seabed and require that the water depth is not too great. Floating turbines have a substructure that floats.

Source Store norske leksikon, offshore wind (in Norwegian)

OPC UA (OPC Unified Architecture)

A standard for exchanging data between industrial systems, published as IEC 62541. All communication between a client and a server goes through the services the standard defines. It is platform independent and has built-in encryption and authentication.

Source IEC, IEC 62541-4, OPC Unified Architecture, Services

Overhead line

Live conductors carried by towers of steel or wood. Lines with voltages below 132 kV are often built with wooden poles. Overhead lines are cheaper to build than underground cable, especially for the highest voltages.

Source Store norske leksikon, overhead line (in Norwegian)

P

Plus customer (prosumer)

A customer who both uses and produces electricity, for example with solar panels on the roof, and who never feeds more than 100 kW into the grid. Someone who both produces and uses electricity is also called a prosumer.

Source Norwegian Energy Regulatory Authority (RME), Network tariffs

Price area (bidding zone)

A part of the power market that gets its own price. Norway is divided into five price areas. Prices differ when there are bottlenecks in the grid between the areas.

Source Energy Facts Norway, The power market

Q

R

Regional grid

The link between the transmission grid and the distribution grid, with voltages from 33 to 132 kV. Large power plants are connected to the regional or transmission grid.

Source Energy Facts Norway, The electricity grid

Regulating power (balancing power)

Power used to keep the balance between consumption and production in real time. Market participants submit bids to increase or decrease, and Statnett selects the cheapest bids in the regulating power market.

Source Store norske leksikon, regulating power (in Norwegian)

Regulations on electrical supply installations (FEF)

The regulations with safety requirements for installations for production, conversion, transmission and distribution of electrical energy. The installations must be designed, built, operated and maintained so that they perform their function without danger to life, health and property. A documented risk assessment must be made for each installation.

Source Lovdata, Regulations on electrical supply installations, sections 2-1 and 2-2 (in Norwegian)

Remote control

Controlling facilities or processes from a different place than where they are located, using electrical, optical or mechanical signals. In electrical installations, remote control is widely used to start, operate and monitor machines and equipment.

Source Store norske leksikon, remote control (in Norwegian)

Repair preparedness

Personnel, expertise and resources to keep operations running and restore function in extraordinary situations. It is dimensioned based on risk assessments and the condition and class of the facilities. Grid companies must assume that sabotage can hit at least two of their facilities at the same time.

Source Lovdata, Power Supply Preparedness Regulations, section 4-1 (in Norwegian)

Reservoir (storage reservoir)

A lake or dammed area where water is stored in periods of high inflow, for use in periods of low inflow. Snowmelt in spring can then be used for power production the following winter. A multi-year reservoir can store water from one year to the next.

Source Store norske leksikon, storage reservoir (in Norwegian)

Reservoir capacity

How much energy the water in the reservoirs can provide when they are full, measured in TWh. Norway has around 1,100 reservoirs with a total capacity of over 87 TWh. Reservoir filling is the share of the capacity that is filled at a given time.

Source Energy Facts Norway, Electricity production

Revenue cap

The maximum revenue the Norwegian Energy Regulatory Authority (RME) allows a grid company to collect, set for each year. Grid companies are monopolies, and the cap determines how much they can collect from customers in total. The cost of energy not supplied (CENS) is deducted from the cap.

Source Norwegian Energy Regulatory Authority (RME), Economic regulation

Run-of-river power plant

A hydropower plant where the flow is regulated only to a small extent by a reservoir. It usually has a low head and a high flow, and is therefore also called a low-head power plant. Many small hydropower plants are run-of-river plants.

Source Store norske leksikon, run-of-river power plant (in Norwegian)

S

SCADA (operational control system)

The systems that monitor, control and protect facilities in the power supply, including control centres, equipment, networks, server rooms and communication links. The organisation must ensure that the system works at all times and is protected against all types of unwanted incidents. External suppliers that are not KBO units may not perform operational control of grid or production facilities.

Source Lovdata, Power Supply Preparedness Regulations, section 7-1 (in Norwegian)

Security of supply

The power system’s ability to deliver electricity of a given quality to end users at all times. It covers energy security (enough energy, for example water in the reservoirs), adequacy (enough capacity in the hours of highest consumption) and operational security (the ability to withstand faults without interruptions).

Source Energy Facts Norway, Security of electricity supply

Sensor

An instrument that gives a signal when it is affected by something physical in its surroundings, such as temperature, pressure, sound, movement or light. Sensors are often named after what they detect, for example pressure sensor.

Sensa Sensa Unity brings together the measurements from the facility and checks the quality of your data.

Source Store norske leksikon, sensor (engineering) (in Norwegian)

Short circuit

An unwanted connection with very low resistance between two or more conductors in an electrical installation. Common causes are insulation failure and, in the power grid, trees falling onto the lines. Protection devices, such as fuses or circuit breakers, interrupt the short-circuit current.

Source Store norske leksikon, short circuit (in Norwegian)

Substation

A facility that converts the voltage in the grid from one level to another. It has transformers, circuit breakers, disconnectors, busbars and instrument transformers. The substation also has a control system and equipment for remote control.

Source Store norske leksikon, substation (in Norwegian)

System operator responsibility

The responsibility for keeping production, consumption and exchange of power in balance at all times, within the capacity limits of the grid. Statnett holds the licence as system operator in Norway.

Source Statnett, About system responsibility (in Norwegian)

System price

A theoretical price for the whole Nordic market, calculated as if there were no bottlenecks in the grid. It is the reference for financial power trading. The price in each price area, the area price, takes the bottlenecks into account.

Source Energy Facts Norway, The power market

T

Transformer

A device that converts alternating current at one voltage into alternating current at another voltage. It usually consists of two windings on a core of laminated iron sheet. Transformers are used throughout power transmission, from the power plant to the customer.

Source Store norske leksikon, transformer (in Norwegian)

Transmission grid

The highest level of the electricity grid, linking large producers and consumers in a nationwide network. The voltage is usually 300 to 420 kV, but in some parts of the country lines at 132 kV are also included. Statnett owns and operates the transmission grid, which also includes the interconnectors to other countries.

Source Energy Facts Norway, The electricity grid

V

VEE (validation, estimation and editing of metered values)

A standard for checking metered values, estimating missing values and correcting errors. The settlement responsible party sets the standard, and RME approves it. The grid company must use it when correcting metered values.

Source Lovdata, Settlement Regulations, sections 3-6 and 3-10 (in Norwegian)

W

Water value

The value of the water in the reservoir, calculated per kWh and compared with the spot price. It is a marginal value that takes account of reservoir size, inflow, installed capacity and requirements for water level and flow. The producer uses the water value to decide production for the next 24 hours.

Source Store norske leksikon, water value (in Norwegian)

Wind farm

A group of wind turbines in a defined area that produce power together, on land or at sea. It is also called a wind power plant. The turbines are connected in a local grid.

Source Store norske leksikon, wind farm (in Norwegian)

Wind turbine

A machine that converts the energy in the wind into rotation, which a generator turns into electrical energy. It usually has three blades on a horizontal shaft in a nacelle on top of a tower, and the nacelle turns so that the blades face the wind. It is often wrongly called a windmill.

Source Store norske leksikon, wind turbine (in Norwegian)